| Author | |
| Date and time | 2023-06-24 05:58:28.3 UTC |
| Latitude | 41.406 |
| Longitude | 19.766 |
| Depth | 18.9 |
| Magnitude | 2.3 ML |
| Region | ALBANIA |
| Latest update | 2023-06-24 06:09:30.5 UTC |
| rms | -- s |
| N° phases used for the localisation | 5 |
| N° stations used for the localisation | 5 |
| Gap | 288.0 ° |
| 95% confidence ellipse | |
| semi major | -- |
| semi minor | -- |
| Azimuth | -- ° |
| Location Type | manual |
Download data for this event
Note: links can take up to 20 minutes from the earthquake to become available
| Operating network | code | Distance° | EvAz | A/M | Phase | Pick time | Residual | T | Reporting network |
|---|---|---|---|---|---|---|---|---|---|
| TIR | 0.090 | 128 | M | P | 2023-06-24 05:58:31.6 | 0 | TIR | ||
| TIR | 0.090 | 128 | M | S | 2023-06-24 05:58:34.1 | 0 | TIR | ||
| LACI | 0.230 | 350 | M | P | 2023-06-24 05:58:34.1 | 0 | TIR | ||
| LACI | 0.230 | 350 | M | S | 2023-06-24 05:58:38.5 | 0 | T | TIR | |
| AL03A | M | P | 2023-06-24 05:58:34.5 | 0 | TIR | ||||
| AL03A | M | S | 2023-06-24 05:58:40.1 | 0 | TIR | ||||
| AL02A | M | P | 2023-06-24 05:58:35.4 | 0 | TIR | ||||
| AL08A | M | P | 2023-06-24 05:58:36.6 | 0 | T | TIR | |||
| AL08A | M | S | 2023-06-24 05:58:43.7 | 0 | TIR | ||||
| AL04A | M | P | 2023-06-24 05:58:38.3 | 0 | TIR | ||||
| PHP | 0.580 | 61 | M | P | 2023-06-24 05:58:40.3 | 0 | T | TIR | |
| PHP | 0.580 | 61 | M | S | 2023-06-24 05:58:49.5 | 0 | TIR | ||
| PUK | 0.640 | 8 | M | P | 2023-06-24 05:58:41.7 | 0 | T | TIR | |
| PUK | 0.640 | 8 | M | S | 2023-06-24 05:58:52.2 | 0 | TIR | ||
| BERA | 0.720 | 169 | M | P | 2023-06-24 05:58:41.7 | 0 | TIR | ||
| BERA | 0.720 | 169 | M | S | 2023-06-24 05:58:53.6 | 0 | TIR | ||
| KKS | 0.820 | 36 | M | P | 2023-06-24 05:58:44.4 | 0 | TIR | ||
| KKS | 0.820 | 36 | M | S | 2023-06-24 05:58:57.6 | 0 | TIR | ||
| AL05A | M | P | 2023-06-24 05:58:44.7 | 0 | TIR | ||||
| AL05A | M | S | 2023-06-24 05:58:59.7 | 0 | T | TIR | |||
| AL01A | M | P | 2023-06-24 05:58:46.1 | 0 | TIR | ||||
| AL01A | M | S | 2023-06-24 05:59:01.4 | 0 | TIR | ||||
| BCI | 0.990 | 13 | M | P | 2023-06-24 05:58:46.8 | 0 | TIR | ||
| BCI | 0.990 | 13 | M | S | 2023-06-24 05:59:02.9 | 0 | TIR | ||
| PDG | 1.090 | 340 | M | P | 2023-06-24 05:58:49.4 | 0 | TIR | ||
| PDG | 1.090 | 340 | M | S | 2023-06-24 05:59:07.5 | 0 | TIR | ||
| PVY | 1.200 | 7 | M | P | 2023-06-24 05:58:50.2 | 0 | TIR | ||
| PVY | 1.200 | 7 | M | S | 2023-06-24 05:59:10.3 | 0 | TIR | ||
| PEJK | 1.290 | 17 | M | P | 2023-06-24 05:58:51.4 | 0 | TIR | ||
| PEJK | 1.290 | 17 | M | S | 2023-06-24 05:59:12.4 | 0 | TIR | ||
| NKME | 1.490 | 336 | M | P | 2023-06-24 05:58:56.4 | 0 | TIR | ||
| NKME | 1.490 | 336 | M | S | 2023-06-24 05:59:17.8 | 0 | TIR | ||
| SJES | 1.870 | 4 | M | P | 2023-06-24 05:59:00.8 | 0 | TIR | ||
| SJES | 1.870 | 4 | M | S | 2023-06-24 05:59:28.1 | 0 | TIR | ||
| BARS | 2.080 | 47 | M | P | 2023-06-24 05:59:04.7 | 0 | TIR | ||
| BARS | 2.080 | 47 | M | S | 2023-06-24 05:59:33.5 | 0 | TIR | ||
| BOSS | 2.300 | 61 | M | P | 2023-06-24 05:59:07.4 | 0 | TIR | ||
| BOSS | 2.300 | 61 | M | S | 2023-06-24 05:59:38.9 | 0 | TIR |