| Author | |
| Date and time | 2015-10-09 16:54:29.2 UTC |
| Latitude | 36.437 |
| Longitude | 1.674 |
| Depth | 10 |
| Magnitude | 4.2 mb |
| Region | NORTHERN ALGERIA |
| Latest update | 2016-04-19 07:25:40.2 UTC |
| rms | 0.83 s |
| N° phases used for the localisation | 60 |
| N° stations used for the localisation | 60 |
| Gap | 229.0 ° |
| 95% confidence ellipse | |
| semi major | 11.7 |
| semi minor | 5.4 |
| Azimuth | 131 ° |
| Location Type | manual |
Download data for this event
Note: links can take up to 20 minutes from the earthquake to become available
| Operating network | code | Distance° | EvAz | A/M | Phase | Pick time | Residual | T | Reporting network |
|---|---|---|---|---|---|---|---|---|---|
| OKGL | 0.920 | 245 | M | P | 2015-10-09 16:54:46.0 | 0.1 | T | MAD | |
| OKGL | 0.920 | 245 | M | S | 2015-10-09 16:54:58.8 | 0.4 | T | MAD | |
| ETRV | 2.510 | 310 | M | P | 2015-10-09 16:55:09.5 | -0.3 | T | MAD | |
| ETRV | 2.510 | 310 | M | S | 2015-10-09 16:55:40.6 | 0.5 | T | MAD | |
| EIBI | 2.600 | 354 | M | P | 2015-10-09 16:55:11.6 | 0.5 | T | MAD | |
| EIBI | 2.600 | 354 | M | S | 2015-10-09 16:55:41.2 | -1.2 | T | MAD | |
| EBEN2 | 2.680 | 327 | M | P | 2015-10-09 16:55:12.4 | 0.2 | T | MAD | |
| EBEN2 | 2.680 | 327 | M | S | 2015-10-09 16:55:43.3 | -1.1 | T | MAD | |
| EMUR | 2.720 | 302 | M | P | 2015-10-09 16:55:12.6 | -0.2 | T | MAD | |
| EMUR | 2.720 | 302 | M | S | 2015-10-09 16:55:44.4 | -0.9 | T | MAD | |
| AFON | 2.840 | 322 | M | P | 2015-10-09 16:55:14.8 | 0.3 | T | MAD | |
| AFON | 2.840 | 322 | M | S | 2015-10-09 16:55:48.8 | 0.6 | T | MAD | |
| E0601 | M | P | 2015-10-09 16:55:16.9 | -0.7 | T | MAD | |||
| E0601 | M | S | 2015-10-09 16:55:52.9 | -0.6 | T | MAD | |||
| ENIJ | 3.160 | 281 | M | P | 2015-10-09 16:55:18.4 | -0.6 | T | MAD | |
| ETOB | 3.380 | 312 | M | P | 2015-10-09 16:55:22.4 | 0.4 | T | MAD | |
| ETOB | 3.380 | 312 | M | S | 2015-10-09 16:56:00.5 | -0.6 | T | MAD | |
| ETOS | 3.440 | 15 | M | P | 2015-10-09 16:55:21.8 | -1.1 | T | MAD | |
| ETOS | 3.440 | 15 | M | S | 2015-10-09 16:56:01.4 | -1.1 | T | MAD | |
| EBER | 3.700 | 279 | M | P | 2015-10-09 16:55:25.4 | -1.1 | T | MAD | |
| EBER | 3.700 | 279 | M | S | 2015-10-09 16:56:08.1 | -0.7 | T | MAD | |
| ECHE | 3.780 | 327 | M | P | 2015-10-09 16:55:26.5 | -1 | T | MAD | |
| ECHE | 3.780 | 327 | M | S | 2015-10-09 16:56:10.0 | -0.5 | T | MAD | |
| EQES | 4.030 | 291 | M | P | 2015-10-09 16:55:31.9 | 0.9 | T | MAD | |
| EQES | 4.030 | 291 | M | S | 2015-10-09 16:56:17.8 | 1.3 | T | MAD | |
| EQTA | 4.170 | 282 | M | P | 2015-10-09 16:55:33.3 | 0.3 | T | MAD | |
| EQTA | 4.170 | 282 | M | S | 2015-10-09 16:56:20.7 | 0.7 | T | MAD | |
| UMV11 | M | P | 2015-10-09 16:55:34.2 | 0.9 | T | MAD | |||
| UMV11 | M | S | 2015-10-09 16:56:21.1 | 0.5 | T | MAD | |||
| EMOS | 4.270 | 337 | M | P | 2015-10-09 16:55:35.4 | 1 | T | MAD | |
| EMOS | 4.270 | 337 | M | S | 2015-10-09 16:56:22.1 | -0.2 | T | MAD | |
| ELGU | 4.280 | 277 | M | P | 2015-10-09 16:55:33.5 | -1 | T | MAD | |
| ELGU | 4.280 | 277 | M | S | 2015-10-09 16:56:21.5 | -1.1 | T | MAD | |
| ERTA | 4.630 | 347 | M | P | 2015-10-09 16:55:39.7 | 0.5 | T | MAD | |
| ERTA | 4.630 | 347 | M | S | 2015-10-09 16:56:30.3 | -0.5 | T | MAD | |
| EGOR | 4.690 | 280 | M | P | 2015-10-09 16:55:40.9 | 0.8 | T | MAD | |
| EGOR | 4.690 | 280 | M | S | 2015-10-09 16:56:32.7 | 0.3 | T | MAD | |
| EPOB | 4.930 | 355 | M | P | 2015-10-09 16:55:43.5 | 0.1 | T | MAD | |
| EPOB | 4.930 | 355 | M | S | 2015-10-09 16:56:37.8 | -0.2 | T | MAD | |
| RETOR | 5.260 | 327 | M | P | 2015-10-09 16:55:49.7 | 1.8 | T | MAD | |
| RETOR | 5.260 | 327 | M | S | 2015-10-09 16:56:46.0 | 0.3 | T | MAD | |
| EADA | 5.270 | 291 | M | P | 2015-10-09 16:55:47.6 | -0.5 | T | MAD | |
| EADA | 5.270 | 291 | M | S | 2015-10-09 16:56:47.0 | 1 | T | MAD | |
| CFON | 5.350 | 6 | M | P | 2015-10-09 16:55:48.8 | -0.3 | T | MAD | |
| CFON | 5.350 | 6 | M | S | 2015-10-09 16:56:48.2 | 0.3 | T | MAD | |
| ESDC | 5.500 | 308 | M | P | 2015-10-09 16:55:50.7 | -0.4 | T | MAD | |
| ESDC | 5.500 | 308 | M | S | 2015-10-09 16:56:51.7 | 0.3 | T | MAD | |
| PAB | 5.680 | 305 | M | P | 2015-10-09 16:55:53.1 | -0.5 | T | MAD | |
| PAB | 5.680 | 305 | M | S | 2015-10-09 16:56:55.2 | -0.5 | T | MAD | |
| ECAB | 5.890 | 288 | M | P | 2015-10-09 16:55:54.9 | -1.6 | T | MAD | |
| ECAB | 5.890 | 288 | M | S | 2015-10-09 16:57:00.5 | -0.2 | T | MAD | |
| CSOR | 5.940 | 356 | M | P | 2015-10-09 16:55:57.8 | 0.4 | T | MAD | |
| CSOR | 5.940 | 356 | M | S | 2015-10-09 16:57:03.1 | 1 | T | MAD | |
| CLLI | 6.040 | 2 | M | P | 2015-10-09 16:55:59.3 | 0.7 | T | MAD | |
| CLLI | 6.040 | 2 | M | S | 2015-10-09 16:57:05.3 | 1 | T | MAD | |
| EMIN | 6.800 | 284 | M | P | 2015-10-09 16:56:08.4 | -0.5 | T | MAD | |
| EMIN | 6.800 | 284 | M | S | 2015-10-09 16:57:21.3 | -0.9 | T | MAD | |
| ELAN | 7.840 | 332 | M | P | 2015-10-09 16:56:25.3 | 2.1 | T | MAD | |
| ECAL | 8.530 | 313 | M | P | 2015-10-09 16:56:33.4 | 0.7 | T | MAD | |
| EARI | 8.660 | 325 | M | P | 2015-10-09 16:56:35.9 | 1.5 | T | MAD |